Cooling Water Sprays to Plenum Chambers

Brief

To design and install ½” nb Air & 1″ nb Water pipelines mixed into an air mist system to cool gas entering through a 12 Plenum chamber complex enabling the client to operate the process in higher ambient temperatures.

The system was fully tested and commissioned to the client’s satisfaction and completed over a 3-month period.

Specifications

Welding & Piping Code ASME B31.3

Welding Process TIG