Brief
Due to extensive building alterations within client site the ERS remit was to re-route a 300 metre long 8″ nb Natural Gas Pipeline.
What we did
ERS designed a new route for the pipeline which also incorporated fabrication and installation of an 80-metre-long pipe bridge to span existing site roads.
The new line was installed at 8 metres above ground level prior to tying into the start and termination points. The pipeline then underwent pressure testing after which the original gas pipeline was removed. The full project was undertaken over a 3-month period
Specifications
Pipe Steel Grade P235GH
Piping: BS EN ISO 13480
Welding: BS EN ISO 15614-1
Welding Process: TIG / MMA